--- title: "Halting Plan Testing" description: "The Halt action interrupts plan testing. You may need to halt plan testing, for example, if you need to fix some environment-related issues and then proceed with testing later (in this case, VM replicas will still continue to run)." canonical: "https://helpcenter.veeam.com/docs/vro/userguide/halting_cdp_plan_testing.html" breadcrumb: "User Guide > Working with Recovery Plans > Working with CDP Replica Plans > Running and Scheduling CDP Replica Plans > Halting Plan Testing" dateModified: "2026-08-26" --- # Halting Plan Testing The **Halt** action interrupts plan testing. You may need to halt plan testing, for example, if you need to fix some environment-related issues and then [proceed with testing later](resuming_cdp_plan_testing.md) (in this case, VM replicas will still continue to run). Or you may need to stop the testing process completely, for example, if you no longer need to test the selected CDP replica plan (in this case, VM replicas will be reverted to the latest restore point). To halt testing of a CDP replica plan: 1. Navigate to **Recovery Plans**. 2. Click the plan name to switch to the **Plan Details** page. 3. On the **Plan Details** page, select the plan and click **Halt**. 4. In the **Halt Plan Test** window, click **Halt Plan Test** to confirm the action. [![Halting Plan Testing](images/halt_testing.png "Halting Plan Testing")](images/halt_testing.png){.toggle scale=55} To cancel testing of a replica plan: 1. Navigate to **Recovery Plans** 2. Click the plan name to switch to the **Plan Details** page. 3. On the **Plan Details** page, select the plan and click **Power Off**. 4. In the **Power Off Plan Testing** window, click **Power Off** to confirm the action. [![Halting Plan Testing](images/shutdown_testing.png "Halting Plan Testing")](images/shutdown_testing.png){.toggle scale=55}