--- title: "Managing Halted CDP Replica Plans" description: "If a critical step fails for a VM from a critical inventory group, the plan may enter the HALTED state. To troubleshoot reasons why a plan failed, use the Plan Execution Report generated as soon as the currently performed action completes." canonical: "https://helpcenter.veeam.com/docs/vro/userguide/managing_halted_cdp_plans.html" breadcrumb: "User Guide > Working with Recovery Plans > Working with CDP Replica Plans > Running and Scheduling CDP Replica Plans > Managing Halted CDP Replica Plans" dateModified: "2026-08-26" --- # Managing Halted CDP Replica Plans If a critical step fails for a VM from a [critical inventory group](configuring_group_settings.md#critical), the plan may enter the *HALTED* state. To troubleshoot reasons why a plan failed, use the **Plan Execution Report** generated as soon as the currently performed action completes. For more information on how to track plan performance history, see [Viewing Plan Execution History](viewing_plan_execution_history.md). After you eliminate the problem that caused the plan to become *HALTED*, you have the following options to resume the plan: - Repeat the last failed step. - Proceed to the next step. ## In This Section - [Running Halted CDP Replica Plans](running_halted_cdp_plans.md) - [Resuming Plan Testing](resuming_cdp_plan_testing.md) - [Undoing Halted CDP Replica Plans](undoing_halted_cdp_plans.md) - [Resetting Halted CDP Replica Plans](resetting_halted_cdp_plans.md)