--- title: "Running and Scheduling CDP Replica Plans" description: "To run a CDP replica plan, it must be ENABLED. To enable a plan: Navigate to Recovery Plans. Select the plan. From the Manage menu, select Properties. OR- Right-click the plan name and select Manage > Properties." canonical: "https://helpcenter.veeam.com/docs/vro/userguide/running_cdp_plans.html" breadcrumb: "User Guide > Working with Recovery Plans > Working with CDP Replica Plans > Running and Scheduling CDP Replica Plans" dateModified: "2026-08-26" --- # Running and Scheduling CDP Replica Plans To run a CDP replica plan, it must be *ENABLED*. To enable a plan: 1. Navigate to **Recovery Plans**. 2. Select the plan. 3. From the **Manage** menu, select **Properties**. OR- Right-click the plan name and select **Manage** > **Properties**. 4. Set the **Availability** toggle to *Enabled*. 5. Click **Save**. If you do not enable a plan before you run it, the [Run Plan](running_failover_cdp.md) wizard will force you to do that as soon as you try running the plan. ::: note 1. An Orchestrator Administrator or Plan Operator can force-enable a plan in the **Run Plan** wizard. However, a Plan Operator will not be able to run a disabled CDP replica plan. For more information on roles that can be assigned to users and user groups working with the Orchestrator UI, see [Managing User Accounts](managing_user_accounts.md). 2. For security purposes, all ‘real-world’ actions associated with CDP replica plans (such as failover and failback) require password confirmation. ::: ## In This Section - [Scheduling Failover](scheduling_failover_cdp.md) - [Running Failover](running_failover_cdp.md) - [Halting Failover](halting_failover_cdp.md) - [Finalizing Failover](finalizing_failover_cdp.md) - [Undoing Failover](undoing_failover_cdp.md) - [Undoing Failback](undoing_failback_cdp.md) - [Resetting CDP Replica Plans](resetting_cdp_plans.md) - [Halting Plan Testing](halting_cdp_plan_testing.md) - [Managing Halted CDP Replica Plans](managing_halted_cdp_plans.md)