--- title: "Running and Scheduling Storage Plans" description: "To run a storage plan, it must be ENABLED. To enable a plan: Navigate to Recovery Plans. Select the plan. From the Manage menu, select Properties. OR- Right-click the plan name and select Manage > Properties. Set the Availability toggle to Enabled." canonical: "https://helpcenter.veeam.com/docs/vro/userguide/running_storage_plans.html" breadcrumb: "User Guide > Working with Recovery Plans > Working with Storage Plans > Running and Scheduling Storage Plans" dateModified: "2026-08-26" --- # Running and Scheduling Storage Plans To run a storage plan, it must be *ENABLED*. To enable a plan: 1. Navigate to **Recovery Plans**. 2. Select the plan. 3. From the **Manage** menu, select **Properties**. OR- Right-click the plan name and select **Manage** > **Properties**. 4. Set the **Availability** toggle to *Enabled*. 5. Click **Save**. If you do not enable a plan before you run it, the [Run Plan](running_storage_failover.md) wizard will force you to do that as soon as you try running the plan. ::: note 1. An Orchestrator Administrator or Plan Operator can force-enable a plan in the **Run Plan** wizard. However, a Plan Operator will not be able to run a disabled storage plan. For more information on roles that can be assigned to users and user groups working with the Orchestrator UI, see [Managing User Accounts](managing_user_accounts.md). 2. For security purposes, all ‘real-world’ actions associated with storage plans require password confirmation. ::: ## In This Section - [Scheduling Storage Failover](scheduling_storage_failover.md) - [Running Storage Failover](running_storage_failover.md) - [Halting Storage Failover](halting_storage_failover.md) - [Resetting Storage Plans](resetting_storage_plans.md) - [Halting Plan Testing](halting_storage_plan_testing.md) - [Managing Halted Storage Plans](managing_halted_storage_plans.md)