--- title: "Scheduling Storage Failover" description: "You can schedule a time for a storage plan to execute. Only the failover process can be scheduled — all other operations must be performed manually in the Orchestrator UI." canonical: "https://helpcenter.veeam.com/docs/vro/userguide/scheduling_storage_failover.html" breadcrumb: "User Guide > Working with Recovery Plans > Working with Storage Plans > Running and Scheduling Storage Plans > Scheduling Storage Failover" dateModified: "2026-08-26" --- # Scheduling Storage Failover You can schedule a time for a storage plan to execute. Only the failover process can be scheduled — all other operations must be performed manually in the Orchestrator UI. ::: note If you configure a schedule for a storage plan, Orchestrator will not be able to trigger reverse replication to reprotect volumes included in the plan — this option is available only when you [run the storage failover process manually](running_storage_failover.md). ::: To schedule a storage plan: 1. Navigate to **Recovery Plans**. 2. Select the plan. From the **Manage** menu, select **Schedule**. -OR- Right-click the plan name and select **Manage** > **Schedule**. 3. In the **Scheduled Tasks** window, do the following: 1. Set the **Schedule plan execution** toggle to *Enabled*. 2. Click the **Configure schedule** link and choose whether you want to run the plan on schedule or after any other plan: - If you want to run the plan at a specific time, click the **Schedule** icon in the **Start on** field, set the desired date and time, and click **Apply**. - If you want to run the plan after another plan, select the **Execute after plan** check box and click **Choose**. Then, in the **Select Plan** window, select the necessary plan and click **Apply**. For a plan to be displayed in the list of available plans, it must be *ENABLED* as described in section [Running and Scheduling Storage Plans](running_storage_plans.md). 3. Review the configuration information and click **Save**. As soon as you click **Save**, Orchestrator will create a new schedule. To track the status of the created schedule, navigate to the **Scheduled tasks** tab. ::: tip You can disable a configured schedule if you no longer need it. To do that, set the **Schedule plan execution** toggle to *Disabled* in the **Scheduled Tasks** window. ::: [![Halting Storage Failover](images/schedule_storage.png "Halting Storage Failover")](images/schedule_storage.png){.toggle scale=65}