Step 8. Review Estimated Cost

[This step applies only if you have created a schedule for the backup policy at the Schedule step of the wizard]

At the Cost Estimation step of the wizard, review the approximate monthly cost of Google Cloud services that Veeam Backup for Google Cloud will require to protect the Cloud Spanner instances added to the backup policy. The total estimated cost includes the following:

  • The cost of creating and maintaining cloud-native snapshots of the Cloud Spanner instances.

For each Cloud Spanner instance included in the backup policy, Veeam Backup for Google Cloud takes into account the amount of storage provisioned for the instance, the number of restore points to be kept in the snapshot chain, and the configured scheduling settings.

  • The cost of creating and storing in backup repositories image-level backups of the Cloud Spanner instances.

For each Cloud Spanner instance included in the backup policy, Veeam Backup for Google Cloud takes into account the amount of storage provisioned for the instance, the period of time during which restore points will be kept in the backup chain, and the configured scheduling and health check settings.

  • The cost of creating and storing in backup repositories archived backups of the Cloud Spanner instances.

For each Cloud Spanner instance included in the backup policy, Veeam Backup for Google Cloud takes into account the amount of storage provisioned for the instance, the period of time during which restore points will be kept in the archive backup chain, and the configured scheduling settings.

  • The cost of transferring the Cloud Spanner instance data between Google Cloud regions during data protection operations (for example, if a protected Cloud Spanner instance and the target storage bucket reside in different regions).
  • The cost of sending API requests to Google Cloud during data protection operations.

During every backup session, Veeam Backup for Google Cloud creates a full backup of each Cloud Spanner instance included in the backup scope. This means that the estimated cost may occur to be significantly higher due to the backup frequency, cross-region data transfer and snapshot charges. To reduce the cost, you can try the following workarounds:

  • To avoid additional costs related to cross-region data transfer, either select a backup repository that resides in the same region as Cloud Spanner instances that you plan to back up, or select an archive repository that resides in the same region as the nearline or standard repository used to store regular backups.
  • To reduce high snapshot charges, adjust the snapshot retention settings to keep less restore points in the snapshot chain.
  • To optimize the cost of storing backups, modify the scheduling settings to run the backup policy less frequently, or specify an archive repository for long-term retention of restore points.

Adding Backup Policy

Page updated 1/16/2024

Page content applies to build 6.0.0.21