System Requirements
The Mine appliance where the Mine with Veeam cluster will be deployed must meet the following hardware requirements.
Specification | Requirement |
---|---|
Minimum number of nodes | 4 |
Processor per node | 2 x Intel Xeon Silver 4214 (12-core 2.2 GHz) or higher |
RAM per node | 192 GB or more |
SSD per node | 2 |
HDD per node | 4 |
Mind that the cluster logical storage capacity is automatically configured depending on the physical capacity of cluster nodes:
Logical Storage Capacity | Node Physical Capacity |
---|---|
1.125 PB | less than 64 TB |
2.25 PB | more than 64 TB and less than 120 TB |
3.375 PB | 120 TB and more |
Important |
Before deploying Mine with Veeam, you can open a support case to ask for a custom configuration of the cluster logical storage capacity. |
The number of nodes defines the number of backup proxies and repositories that the foundation server deploys in the Mine with Veeam cluster. For more information, see Architecture Overview.
To expand a deployed Mine with Veeam cluster, you can install 2-node blocks. However, this will not change the number of proxies and repositories in the cluster. For more information, see Expanding Mine with Veeam.