Report Output
The Summary doughnut chart will show results of the latest sessions for jobs:
- Total number of jobs that completed with the Success status
- Total number of jobs that ended up with the Warning status
- Total number of jobs that ended up with the Failed status
In this example, the report shows equal number (1) of Success, Warning and Failed jobs.
The details table will display a list of performed backup and replication jobs. For all VM processing tasks that failed during the last session, the Failed backup tasks table will display a list of failed attempts to process a VM. The details of a failed task will include the following information: the date and time of the failed attempt and the VM that has been processed.