Veeam B&R Job

Monitor/Alert Name

Target

Parent Monitor

Threshold(s)/Event(s)

Alert Description

Veeam Backup: Backup Copy Job (Immediate Copy) Worker Status

Veeam Backup Copy Job (Immediate Copy) Worker

Availability

Red:
Job failed event

Yellow:
Job warning event

Green:
Successful job event

Red: The [jobname] Job has completed with error.

Yellow: The [jobname] Job has completed with warning.

Veeam Backup: Oracle Archived Log Backup Job Status

Veeam Oracle Archived Log Backup Job

Availability

Red:
Job failed event

Yellow:
Job warning event

Green:
Successful job event

Red: The [jobname] Job has completed with error.

Yellow: The [jobname] Job has completed with warning.

Veeam Backup: SQL Transaction Log Job Status

Veeam SQL Transaction Log Backup Job

Availability

Red:
Job failed event

Yellow:
Job warning event

Green:
Successful job event

Red: The [jobname] Job has completed with error.

Yellow: The [jobname] Job has completed with warning.

Veeam Backup: Job Status

Veeam B&R Job

Availability

Red:
Job failed event

Yellow:
Job warning event

Green:
Successful job event

Red: The [job type] Job [jobname] has finished with issues. Error reason specified by Veeam Backup server: [reason]

Yellow: No alert

Veeam Backup: Job RPO Compliance

Veeam B&R Job

Configuration

Red:
No successful job completion event within [RPO_window]

Yellow:
Job schedule will produce next restore point outside of [RPO_window]

Green:
There is a successfully finished event ,and job is configured to create next restore point within RPO window

Red: The Veeam Backup & Replication Job is not compliant with the assigned RPO threshold. Check job schedule and configuration, the job could be disabled or unable to perform a backup.

Current RPO for this job is set to [RPO_threshold_parameter]

The following objects don’t have a valid restore point :

[objects_list]

Yellow: The Veeam Backup & Replication Job may not be compliant with the assigned RPO threshold, because the configured schedule does not meet the requirement.

Current RPO for this job is set to [RPO_threshold_parameter]

Last successful restore point is [last restore point timestamp].

Next run for the Job is [Job next run].

With current Job configuration you will have RPO violation for [N] hours.

Veeam Backup: Job transport mode status

Veeam B&R Job

Availability

Red:
Some VM disks failed to be transferred by a preferred transport mode (when job is configured to SAN or ad-hoc and failed to network mode) and Job finished with Warning/Healthy state

Yellow:
Some VM disks failed to be transferred by a preferred transport mode (when job is configured to SAN or ad-hoc and failed to network mode)

Green:
All VM disks have been backed up using SAN, ad-hoc or network mode (when network is preferred)

The Job was unable to perform the backup operation using a preferred transport mode. One or more disks for the following VMs failed-over to the Network mode transfer:

[VM names]