Two-Phase Failback

In this article

    You can use the cmdlet in this topic to perform the following operations.

    Cmdlet

    Operation

    New-VBRFailbackSwitchingSchedule

    Defines the failback switching schedule.

    Get-VBRFailbackSwitchingSchedule

    Returns the failback switching schedule.

    Set-VBRFailbackSwitchingSchedule

    Modifies the failback switching schedule.

    I want to report a typo

    There is a misspelling right here:

     

    I want to let the Veeam Documentation Team know about that.