Policy Scheduling Options
The PolicyScheduleOptions element of the CDP policy resource contains the following scheduling options for the CDP policy.
|
Element |
Type |
Description |
|---|---|---|
|
RecoveryPointObjectiveSeconds |
Int64 |
Recovery point objective in seconds. |
|
RecoveryPointObjectiveMinutes |
Int64 |
Recovery point objective in minutes. |
|
RPOSchedule |
RPOScheduleType |
Time intervals that define when the CDP policy is allowed to create a replicated state of the source VMs. For details, see RPO Schedule Options. |
|
RPOReporting |
RPOReportingType |
Defines RPO reporting settings. For details, see RPO Reporting Options. |
|
ShortTermRetentionMinutes |
Int64 |
Time period for which short-term restore points must be stored, in minutes. |
|
ShortTermRetentionHours |
Int64 |
Time period for which short-term restore points must be stored, in hours. |
|
LongTermRetentionHours |
Int64 |
Defines how often new long-term restore points must be created, in hours. |
|
LongTermRetentionKeepDays |
Int64 |
Defines for how long the long-term restore points must be retained, in days. |
|
LongTermRetentionSchedule |
LongTermRetentionScheduleType |
Time intervals that define when the CDP policy must create application-consistent and when crash-consistent long-term restore points. For details, see Long-Term Retention Schedule Options. |
The RPOSchedule element contains the following RPO schedule options.
|
Element |
Type |
Description |
|---|---|---|
|
Enabled |
Boolean |
Defines whether RPO schedule options are specified for the CDP policy. |
|
TimePeriods |
TimePeriodsType |
Defines an hourly scheme by which the CDP policy must run. The schedule scheme is constructed by the following pattern: <Day Name ="Sunday"> 1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1</Day> where 1 means the CDP policy must run, 0 means the CDP policy must not run. |
The RPOReporting element contains the following RPO reporting options.
|
Element |
Type |
Description |
|---|---|---|
|
Enabled |
Boolean |
Defines whether RPO reporting options are specified for the job. |
|
MarkAsWarning |
CDPReplicaRPOReportingWarningOptionsType |
Time interval in seconds or minutes before Veeam Backup & Replication sends a notification with a warning if a newly created restore point is not transferred to the target within the set RPO. For details, see Warning Settings. |
|
MarkAsFailed |
CDPReplicaRPOReportingFailedOptionsType |
Time interval in seconds or minutes before Veeam Backup & Replication sends a notification with an error if a newly created restore point is not transferred to the target within the set RPO. For details, see Error Settings. |
The MarkAsWarning element contains the following warning settings.
|
Element |
Type |
Description |
|---|---|---|
|
Enabled |
Boolean |
Defines whether warning notifications are enabled. |
|
RPOThresholdSeconds |
Int |
Time interval in seconds before Veeam Backup & Replication sends a notification with a warning if a newly created restore point is not transferred to the target within the set RPO. |
|
RPOThresholdMinutes |
Int |
Time interval in minutes before Veeam Backup & Replication sends a notification with a warning if a newly created restore point is not transferred to the target within the set RPO. |
The MarkAsFailed element contains the following error settings.
|
Element |
Type |
Description |
|---|---|---|
|
Enabled |
Boolean |
Defines whether error notifications are enabled. |
|
RPOThresholdSeconds |
Int |
Time interval in seconds before Veeam Backup & Replication sends a notification with an error if a newly created restore point is not transferred to the target within the set RPO. |
|
RPOThresholdMinutes |
Int |
Time interval in minutes before Veeam Backup & Replication sends a notification with an error if a newly created restore point is not transferred to the target within the set RPO. |
Long-Term Retention Schedule Options
The LongTermRetentionSchedule element contains the following periodic scheduling options.
|
Element |
Type |
Description |
|---|---|---|
|
Enabled |
Boolean |
Defines whether long-term retention schedule options are specified for the job. |
|
Schedule |
TimePeriodsType |
Defines an hourly scheme when the CDP policy must create application-consistent and when crash-consistent long-term restore points. The scheduling scheme is constructed by the following pattern: <Day Name ="Sunday"> 1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1,1</Day> where 1 means the CDP policy must create crash-consistent long-term restore points, 2 means the CDP policy must create application-consistent long-term restore points. |