Performance Forecast for Hyper-V SMB Volumes

This report forecasts space resource utilization for Hyper-V Server Message Block (SMB) volumes.

Description

The Performance Forecast for Hyper-V SMB Volumes report forecasts how many days remain before the level of resource utilization reaches the specified threshold values. The report allows analyzing the following resource utilization parameters: free space and used space.

To calculate future volume performance, the report analyzes historical performance data for the specified period in the past, calculates the performance utilization trend and applies this trend to the forecast horizon. For better forecast accuracy, along with the performance trend the report provides trend confidence interval that represents the best- and worst-case scenarios. This allows you to estimate various possible outcomes and helps you rationally plan your resources.

If one or more specified thresholds are breached within the forecast interval, the report marks the volume as problematic and lists constraining resources for it. The report also provides recommendations on appropriate resource allocation to prevent possible resource shortfalls in future.

Parameters

Performance Data From: defines a date in the past starting from which historical performance data will be used to calculate the performance trend. The report analyzes historical performance data starting from this date to the current date (data collection period).

Note

To make a forecast, the report must use historical performance data for at least 72 hours.

Forecast Horizon: defines the forecast period. The calculated performance utilization trend is applied to the time interval that starts from the current date to the forecast horizon date.

Note

The date in the Forecast Horizon field must be a date in future.

Show details: defines whether the report will display expanded or collapsed charts.

Mode: defines whether the report will display all results or problematic areas only (problematic areas are SMB volumes for which resource utilization thresholds will be breached within the forecast period).

Scope: defines a list of Groups or Objects that will be analyzed in the report (by default, the Veeam Hyper-V SMB Volumes Group is selected). The Add Group option returns a Group and all objects that a group contains. The Add Object option returns only the selected object.

Threshold: Storage Volume Free Space (%): defines the free space threshold as a percentage of total available space.

Threshold: Storage Volume Used Space (%): defines the used space threshold as a percentage of total used space.

Aspects to be Analyzed: defines the resource that will be analyzed in the report (Hyper-V SMB Volume (Veeam MP): Free Space (GB), Hyper-V SMB Volume (Veeam MP): Used Space (GB), or both aspects).

Note

If you choose not to analyze an aspect, the report will ignore the threshold specified for this aspect.

Sample Usage

Forecast the number of days left before the amount of SMB free space reaches 30%. Make sure that this threshold will not be breached within the next 30 days. Use the historical performance data for the previous month to calculate the resource utilization trend.

Instructions

  1. Open the Performance Forecast for Hyper-V SMB Volumes report.
  2. From the Performance Data From list, select Previous Month > First Day.
  3. From the Forecast Horizon list, select a date in future (30 days from today).
  4. From the Show details list, select Expand Charts.
  5. From the Mode list, select Show problematic areas only.
  6. To include all available SMB volumes in the report, leave the Scope section without changes.
  7. In the Threshold: Storage Volume Free Space (%) field, enter 30.
  8. In the Aspects to be Analyzed field, select Hyper-V SMB Volume (Veeam MP): Free Space (GB).
  9. Click Run to view the report.

Report Output

The Virtual Infrastructure Described table will provide an overview for SMB volumes included in the report scope: total number of volumes and total volume capacity.

The Performance Forecast Analysis and Recommendations table will provide the following details for every volume:

Column

Description

Name

Name of the SMB volume.

Analysis Result*

Result of the prediction analysis. Possible analysis results are:

  • Passed means that the resource thresholds will not be breached within the forecast period.
  • Failed means the resource thresholds will be breached within the forecast period or have already been breached within the data collection period.

Constraining Resource*

Resource for which the specified threshold will be breached first within the forecast period.

In this particular example, the report will display Free Space (GB) as the constraining resource.

If you run the report and choose both Free Space and Used Space aspects to be analyzed, there may be a situation where both these thresholds will be breached within the forecast period and the Used Space is reported to be breached first. In this case, the report will display Used Space as the constraining resource. However, the Recommendations will be provided both for Free Space and Used Space resources.

Days Left

Number of days left before the constraining resource threshold is breached. The number of days is shown as the worst-to-best case range.

Recommendations*

Recommendations on appropriate resource allocation.

Recommendations for a resource will be provided in case the specified threshold for the resource is breached within the forecast period or has already been breached within the data collection period.

*Provided results and recommendations are based on the worst-case scenario.

Details

Report details will provide in-depth forecast information for every SMB volume included in the report scope.

The Performance Forecast section will show a chart and a details table for each analyzed resource.

The performance forecast charts will display the following types of data series for the analyzed data collection period:

  • Trend and its deviation represent resource utilization trend and the 95% confidence interval for it. The upper border of the confidence interval represents the best-case scenario. The lower border of the confidence interval represents the worst-case scenario. The width of the interval between the best and worst-case series depends on the variability of the collected historical performance data (the greater the variability, the wider the interval).
  • Value represents the historical performance data for the data collection period (for example, how the amount of free space has changed within the analyzed period)
  • Threshold represents the threshold specified for the volume resource
  • Capacity represents the total volume capacity (will be displayed only for the Free Space performance forecast chart)

The performance forecast tables will provide the following details for the volume resource:

Column

Description

Aspect

Name of the analyzed resource.

Threshold

Specified threshold value.

Prediction

Prediction on whether the resource threshold will be breached within the forecast period. Possible prediction values are:

  • Threshold will be achieved means that threshold will be achieved within the forecast period in both worst- and best-case scenarios.
  • Threshold may be achieved means that only worst-case data series will breach the threshold within the forecast period.
  • Threshold will not be achieved means that neither best-case nor worst-case data series will breach the threshold within the forecast period.
  • Threshold is achieved means that the trend line has already breached the threshold.

Days Left

Number of days left before the specified threshold is breached. The number of days is shown both for the worst-case scenario and best-case scenario.

Metric Forecast

Predicted metric value on the forecast horizon date (that is, at the end of the forecast period). The metric value is shown both for the best-case scenario and worst-case scenario.

Available Resources

Amount of non-consumed resources on the forecast horizon date (that is, at the end of the forecast period):

The amount of available resources is calculated as the difference between the specified threshold value and the metric forecast value. Positive values mean that spare resources will be available. Negative values mean that extra resources are required to survive

The values are shown both for the best-case scenario and worst-case scenario.