Step 7. Track Test Progress

In this article

    The lab will power on, start lab groups and begin testing the plan. To track the lab progress, switch to the DataLab Details page.

    Tip

    If the lab halts, the plan will fail to be tested. To learn how to resume plan testing, see Managing Halted Restore Plans.

    As soon as the test is over, the DataLab Test Report will be generated. The plan and the DataLab will be powered off or will keep running, depending on the power options chosen in the Run DataLab Test wizard.

    Note

    Even if you have enabled the Test then power off after option, the test will be considered to be completed when all plan steps have been run. The DataLab Test Report will be generated at that point.