Step 3. Specify Backup Copy Job Target
At the Target step of the wizard, specify a target repository and retention settings for the backup copy job:
- From the Backup repository list, select an external backup storage for copied backups.
- In the Retention Policy section, specify a retention period for created backups in days or restore points.
- In the GFS Setting section, specify weekly, monthly and yearly retention settings.