
Committing Failback
You can choose to finalize failback from VM replicas to production VMs right after the failback operation completes.
To commit failback for a plan in the FAILBACK state:
- Select the plan. From the Launch menu, select Run.
-OR-
Click the plan name to switch to the Plan Details page, and click Run.
- Complete the Run Plan wizard.
- For security purposes, at the Enter Credentials step, retype the VAO Administrator or Plan Author password.
- At the Commit Failback step, review the description of the commit failback process.
- At the Summary step, review configuration information and click Finish.
|
After the commit failback process completes, VAO will leave the plan in the IN USE state. By design, this makes the results of the commit failback process accessible in the VAO UI as long as required, and also prevents the plan from being modified by any automatic updates related to infrastructure changes. If you want to perform any further actions with the plan (for example, to test the plan, to run readiness checks or to execute the plan again), reset the plan state as described in section Resetting Failover Plans. |