Committing Failback
To commit failback for a plan in the FAILBACK state:
- Navigate to Recovery Plans.
- Select the plan. From the Launch menu, select Run.
-OR-
Click the plan name to switch to the Plan Details page, and click Run.
- In the Progress Plan window, do the following:
- For security purposes, retype your password and click Next.
- Review configuration information and click Run.
Tip
After the commit failback process completes, Orchestrator will leave the plan in the IN-USE mode. By design, this makes the results of the commit failback process accessible in the Orchestrator UI as long as required, and also prevents the plan from being modified by any automatic updates related to infrastructure changes.
If you want to perform any further actions with the plan (for example, to run readiness checks or to execute the plan again), reset the plan as described in section Resetting CDP Replica Plans.