Setting Group Processing Order

Inventory groups in a recovery plan are processed in the order they appear in the Plan Groups list. If some machines in a group are dependent upon machines in other groups, make sure that the required group is recovered first.

To change the processing order for inventory groups included in a recovery plan:

  1. Navigate to Recovery Plans.
  2. Select the plan and click Manage > Edit.
  3. On the Edit Plan page:
  1. In the Plan Groups column, select an inventory group.
  2. To move the group up or down the list, use the Up and Down arrows in the Plan Groups column.
  3. To save changes made to the plan settings, click Save.

 

Note

By design, each recovery plan contains 2 default groups — Pre-plan steps and Post-plan steps. These groups include plan steps that run before and after the recovery process. You cannot change the processing order for the Pre-plan steps and Post-plan steps groups, but you can add and remove steps for these groups. For more information, see Configuring Steps.

 

Setting Group Processing Order

Page updated 1/15/2024

Page content applies to build 7.1.0.278