Orchestrating Failback with HPE Storage Plans
After you run an HPE storage plan and want to fail back to VMs running on primary volumes, you must perform the following steps:
- Add a new storage recovery location and specify the primary volumes as target storage systems as described in section Managing Recovery Locations.
- Reset the plan as described in section Resetting Storage Plans.
- Wait approximately 5 minutes for Orchestrator to collect data on the updated configuration.
- Run a readiness check to ensure the plan is ready for failback as described in section Running Plan Readiness Check.
- Run the plan again as described in section Running Storage Failover.
- Perform the start operation for the remote copy group as described in the Hewlett Packard Enterprise Support Center for 3PAR storage systems and Primera storage systems.
Tip |
If you have not enabled the auto synchronize option for the remote copy group before running the plan, you should also:
|