Orchestrating Failback with Storage Plans
In case you run a storage plan and want to switch from recovered VMs back to VMs running on source volumes, you must perform the following steps:
- Reset the plan state as described in section Resetting Storage Plans.
- Add a new storage recovery location as described in section Adding Recovery Locations. Specify new host, network and storage resources to be used when performing failback to the location.
- Reverse the protection relationship between the source and destination volumes as described in the NetApp ONTAP Documentation Center.
- Run the plan again as described in section Running Storage Failover.