Starting Switchover Manually

In this article

    If you have selected the Manual switchover option in the Instant Recovery wizard, you can start the switchover at any time if the database is in the Ready to switchover state.

    To start the switchover manually, do the following:

    1. In the navigation pane, under the Instant Recovery node, select a published database.
    2. On the Instant Recovery tab, select Switchover Now or right-click the database and select Switchover now.

    Starting Switchover Manually 

    I want to report a typo

    There is a misspelling right here:

     

    I want to let the Veeam Documentation Team know about that.