第 11 步使用向导完成操作

在本页面

    At the Summary step of the wizard, review the configured failback settings and click Finish.

    If you want to power on the production VMs right after the switch to production operation is performed, select the Power on target VM after restoring check box.

    What You Do Next

    Failback is an intermediate step that needs to be finalized. You can finalize failback in the following ways:

    Step 11. Finish Working with Wizard