Creating GFS Tape Jobs

To create a GFS archive on tape, you need to create a GFS media pool and target a backup to tape job to it. Technically, a GFS tape job is a variant of backup to tape job. When you select a GFS media pool as target, the job schedule automatically changes to the GFS mode. For details, see Creating Backup to Tape Jobs.

As a source, you can use a backup job with any backup method: forever forward incremental, forward incremental or reverse incremental.

Note

If you use a job with enabled GFS retention as a source for a GFS tape job, the GFS tape job writes restore points to tapes according to its own schedule. The schedule of the source job is not taken into account.

Related Topics

Page updated 10/4/2024

Page content applies to build 12.3.0.310