Changing Switching Time

In this article

    The following instructions apply if you have selected to switch from replicas to production VMs manually or at the scheduled time at the Failback Mode step of the Failback wizard.

    To change the time when Veeam Backup & Replication will switch from replicas to production VMs:

    1. Open the Home view.
    2. In the inventory pane, navigate to the Replicas > Active node.
    3. Right-click a replica in the Ready to switch state and select Change switching time.

    Change switching time

    I want to report a typo

    There is a misspelling right here:

     

    I want to let the Veeam Documentation Team know about that.