Step 9. Finish Working with Wizard
At the Summary step of the wizard, review the configured failback settings. If you want to power on the production VMs right after the switch to production operation is performed, select the Power on target vApp after failback check box. Then click Finish.
What You Do Next
Failback is an intermediate step that needs to be finalized. You can finalize failback in the following ways: