Before You Begin

In this article

    Before you fail over to a vApp replica, check the following prerequisites:

    • The failover operation can be performed for vApp that have been successfully replicated at least once.
    • vApp replicas must be in the Ready state.
    • The VMs added to the target vApp must be powered off.
    I want to report a typo

    There is a misspelling right here:

     

    I want to let the Veeam Documentation Team know about that.