Changing Switchover Time

The following instructions apply if you have selected to start the switchover manually or at the scheduled time in the Migrate to production wizard.

To change the time when Veeam Backup & Replication will perform the switchover:

  1. Open the Home view.
  2. In the inventory pane, navigate to the Instant Recovery node.
  3. Right-click the VM for which you want to change the schedule and select Change switchover time.